X

Accelerated Bridge Construction

Engineering eBooks Library

 
  • Filter
  • Time
  • Show
Clear All
new posts
  • Saadedin
    Thread Author
    Administrator
    • Sep 2018 
    • 35730 
    • 18,372 
    • 2,792 

    Accelerated Bridge Construction

    Authors: Federal Highway Administration
    Pages: 347
    Language: English
    Format: PDF
    Size: 12.4 MB
    Civil Books





    Table Of Contents

    Code:
    • Accelerated Bridge Construction (ABC)
    • Conventional Bridge Construction
    • Time Metrics For ABC
    • Onsite Construction Time
    • Mobility Impact Time
    • Prefabricated Bridge Elements And Systems (PBES)
    • Elements
    • Deck Elements
    • Beam Elements
    • Pier Elements
    • Abutment And Wall Elements
    • Miscellaneous Elements
    • Systems
    • Superstructure Systems
    • Superstructure/Substructure Systems
    • Total Bridge Systems
    • Glossary Of Terms
    • Chapter Introduction WHY ABC?
    • Purpose And Use Of This Manual
    • Intended Users
    • Decision Makers
    • Project Managers
    • Bridge Designers
    Why Use Accelerated Bridge Construction?
    • Benefits Of ABC Projects Using PBES
    • Reduced Road User Impacts
    • Improved Worker And Motorist Safety
    • Expedited Project Planning Process
    • Improved Quality
    • Improved Constructability
    • Reduced Cost To Society
    • Positive Public Perception Of ABC
    • Public Response To ABC Projects
    • Chapter Accelerated Bridge Construction Technologies
    • Foundation And Wall Elements
    • Continuous Flight Auger Piles (CFA)
    • Geosynthetic Reinforced Soil Integrated Bridge System (GRS/IBS)
    • Prefabricated Pier Cofferdams
    • Rapid Embankment Construction
    • Expanded Polystyrene (EPS) Geofoam
    • Accelerated Embankment Preload Techniques
    • Column Supported Embankment Techniques
    • Prefabricated Bridge Elements And Systems
    • Prefabricated Elements
    • Prefabricated Systems
    • Structural Placement Methods
    • Self Propelled Modular Transporters (Spmts)
    • Longitudinal Launching
    • Horizontal Skidding Or Sliding
    Other Heavy Lifting Equipment And Methods
    • Conventional Cranes
    • Fast Track Contracting
    • Accelerated Project Delivery
    • Design-Build (DB)
    • Construction Manager General Contractor (CMGC)
    • Contracting Provisions
    • Best Value Selection
    • A+B And A+B+C Bidding
    • Continuity Of The Construction Process
    • Incentive/Disincentive (I/D) Clauses
    • Warranties
    • Lane Rental
    • Applicability Of ABC Technologies To Different Bridge Projects
    • Rehabilitation Of Existing Bridges
    • Deck Replacement
    • Superstructure Replacement
    • Substructure Replacement
    • Replacement Of Existing Bridges And New Bridges
    • Staging
    • Full Closure And New Construction
    • Effect Of Structure Type On ABC Methods
    • Curved, Skewed And Flared Bridges
    • Bridges With Transverse Floor Beams
    • (Trusses And Widely Spaced Girder Bridges)
    • Box Culverts
    • Chapter PBES For ABC – Planning And Scoping Projects
    • ABC Decision Making Process
    Decision Process For Selection Of Appropriate ABC Methods
    • Defining The Problem
    • Site Constraints
    • Staging Areas
    • Traffic Management
    • Right Of Way Issues
    • Utilities
    • Local Government Constraints
    • Structure Type Options
    • Flowcharts For Determination Of Appropriate ABC Methods
    • Example Project
    • Structure Type Selection Analysis Including Overall Project Costs
    • Cost Evaluation
    • Public Involvement
    • Chapter Implementing ABC In A Transportation Agency (A Case Study From The Utah
    • DOT)
    • General Approach: No Magic Bullet
    • Strategic Layers Of Implementation
    • Upper Management And Politics
    • Mid-Level And Organization
    • Project Level
    • Identify ABC Champions At All Levels
    • Stakeholder Buy-In
    • Scanning Tours
    • Demonstration Projects
    • The Role Of Innovative Contracting
    • PBES Decision Making Framework
    Establish A “Program Of Projects”
    • Develop Specifications, Standards, And Standard Details
    • Communication
    • Measure And Share Successes
    • Conclusions
    • Chapter Prefabricated Bridge Elements
    • Materials
    • Structural Steel
    • Concrete (Normal Weight And Lightweight)
    • Timber
    • Aluminum
    • Fiber-Reinforced Polymer
    • Grouts
    • Grout Types
    • Ultra High Performance Concrete
    • Corrosion Resistant Reinforcing Steel
    • Stainless Steel
    • Low-Carbon, Chromium, Steel Bars
    • Coated And Galvanized Bars
    • Fiber Reinforced Polymer (FRP) Bars
    • Superstructure Elements
    • Beams And Girders
    • Steel
    Precast/Prestressed Concrete
    • Stay-In-Place Deck Forming
    • Corrugated Steel
    • Partial-Depth Precast Concrete Deck Panels
    • Full-Depth Deck Panels
    • Precast/Prestressed Concrete
    • Steel Grid
    • Fiber Reinforced Polymer
    • Modular Superstructure Systems
    • Modular Steel Systems
    • Bridge Construction
    • Bridge Construction Examples
    • Bridge Construction Pdf
    • Bridge Construction Manual
    • Bridge Construction Techniques
    • Foundation Reuse In Bridge Construction
    • What Is Bridge Construction
    • Disadvantages Of Bridge Construction
    • Fastest Bridge Construction In India
    • Types Of Bridge Construction
    • History Of Bridge Construction
    • Bridge Construction Best Practices And Techniques
    • Bridge Construction Projects
    • Bridge Construction
    • Bridge Construction Examples
    • Bridge Construction Techniques
    • Bridge Construction Pdf
    • Bridge Construction Manual
    • Caltrans Accelerated Bridge Construction
    • Did A Bridge Collapse Today
    • Bridge Construction Conference
    What Is Accelerated Bridge Construction
    • Disadvantages Of Bridge Construction
    • Bridge Construction Best Practices And Techniques
    • Who Constructed Brooklyn Bridge
    • Why Are Bridges Concrete
    • Bridge Construction
    • Bridge Construction Conference
    • Caltrans Accelerated Bridge Construction
    • Disadvantages Of Bridge Construction
    • Types Of Accelerated Bridge Construction
    • Bridge Construction Methods
    • Precast Concrete Elements For Bridge Construction
    • History Of Accelerated Bridge Construction
    • Bridge Construction (Abc)
    • Bridge Construction Best Practices And Techniques
    • Bridge Construction Best Practices And Techniques Pdf
    • Bridge Construction Examples
    • What Is Accelerated Bridge Construction
    • Abc Accelerated Bridge Construction
    • Bridge Construction Procedure
    • Accelerated Bridge Construction Connections
    Download
    *


Working...
X